Capability & infrastructure

Our capability and project controls.

Before workSurvey + isolation plan
During workInspection + testing
At handoverDrawings + records
GEDA approved EPC solar agency
R&B registered Class “A” electrical contractor
Electrical contractor licence G/SUR/C-3967 · valid to 2030
DGVCL / MNRE empanelled rooftop solar vendor
Open industrial distribution panel with organised busbars and circuit protection

Electrical work behind the array

The rooftop is one half of the system.

Protection, cable routes, the connection point and shutdown sequence are checked before installation starts. That keeps the solar work compatible with the equipment already running on site.

Before work
Survey + isolation plan
During work
Inspection + testing
At handover
Drawings + test records

Four checkpoints

What we close before energisation.

These are the records and decisions that keep a project understandable after the installation team leaves.

01

Survey record

Roof condition, access, services, connection point and available drawings are recorded before design begins.

02

Isolation plan

Live panels, shutdown windows and the safe work sequence are agreed with the site team.

03

Test sequence

Protection, cable routes, earthing and terminations are inspected while the work is still visible.

04

Handover file

As-built drawings, equipment details and test records are organised for the team that will operate the system.

Work you can inspect

The work behind the array.

The protection, structure and bonding details are where dependable installations separate themselves.

Installed solar inverter with labelled AC and DC protection boards
Protection Inverter, ACDB and DCDB installation
Green and yellow earthing conductor bonded to the solar mounting structure
Bonding Earthing at the module structure
Raised solar mounting frame installed on an urban rooftop
Structure Access and load paths planned before mounting

How the work is controlled

One team carries the work from survey to handover.

Project functions

Coordinated as one scope

01Design and estimation
02Project engineering
03Procurement and logistics
04Site execution
05Testing and commissioning
Live-site practice

Planned around your operations

01Permit-to-work coordination
02PPE and toolbox talks
03Isolation and lockout
04QA inspection records
05As-built handover

Current company details

Details your procurement team can verify.

Use the current compliance page for registrations and supporting documents. For a vendor review, request the latest company profile below.

GEDA approvalEPC SolarCurrent
R&B registrationClass “A”To 2027
Electrical contractor licenceG/SUR/C-3967To 2030
DGVCL / MNRE empanelmentNPDG-158To 2030
GST registration24AAVFD1418J1ZBRegular
MSME UdyamUDYAM-GJ-22-0254484Registered
In operation since2014Surat

Company profile

Need the capability file for vendor review?

Share your business details and our team will send the current profile directly.

Free site assessment

Request a site assessment.

We’ll review the likely system range, roof access and electrical connection before arranging the visit.

  • Roof and access review
  • Daytime load check
  • Electrical connection route
  • Execution and approval plan